News APP

NewsApp (Free)

Read news as it happens
Download NewsApp

Available on  gplay

This article was first published 15 years ago
Home  » Business » Mumbai sea link to consume 1,000 KW power a day

Mumbai sea link to consume 1,000 KW power a day

Source: PTI
June 26, 2009 10:28 IST
Get Rediff News in your Inbox:

The engineering marvel Bandra-Worli sea link, which opens on June 30, is likely to consume 1,000 KW power a day, enought to meet the electricity requirement to 100 households.

"We have installed a transmitter which has 1,000 KVA capacity. This has been placed keeping the demand in mind," Bajaj Electrical's Head Engineering Project Lalit Mehta told PTI.

KVA is a measure of demand load while KWH is a measure of usage. India's per-capita consumption is 750 KWH or 750 units, while the world average is 1,000 KWH per annum. A 40W tube can consume one KWH power in 250 hours.

Bajaj Electricals has got the Rs 9 crore (Rs 90 million) illumination job of the 5.6 kilometer-long bridge, which is going to be a tourist spot in the island city.

Power for illuminating the bridge would be supplied by Brihanmumbai Electric Supply and Transport and Reliance Power.

The bridge will house diesel generator sets and auto mains failure panels to cater to critical load like, monitoring, survellience and communication equipment emergency services like aviation obstruction lights.

Get Rediff News in your Inbox:
Source: PTI© Copyright 2024 PTI. All rights reserved. Republication or redistribution of PTI content, including by framing or similar means, is expressly prohibited without the prior written consent.
 

Moneywiz Live!